Building a house takes eight stages, from the first design you like to the day you break ground. Most of the money people lose is decided in the first three, before a designer draws a line. This guide walks through each stage in order, what it costs in time, and what to check about your lot before you pay anyone.
Rule of thumb for one detached house in a large Canadian or US city. Permit time varies the most from city to city.
Four rules decide the size of the house: what the zone allows, setbacks, height and floor area.
Every lot sits in a zone, and the zoning by-law sets the box a house has to fit inside. Setbacks push the walls in from the lot lines, the height limit caps the roof, and a floor area limit caps the total floor space. A design that ignores one of them goes back to the drawing board at permit, after you have paid for it.
Imagery: Esri World ImageryBefore by-law exceptions. On this lot the setbacks, not the floor area limit, shape the house: a 45 m² footprint needs three floors under the 10 m height to reach the 97 m² allowed.
Whether a detached house, a duplex or a multiplex is allowed on the lot at all.
How far walls sit from the front, rear and side lot lines.
A cap in metres or feet, sometimes with a storey limit too.
Total floor space as a multiple of the lot, called FAR, FSR or FSI.
Heritage, ravine, flood or tree rules that sit on top of the zone.
Water, sewer and power at the street, and the cost to connect.
Zoning says what is allowed. These reports say what is actually there.
Order these before design starts, so your designer works from real dimensions and not from a plot plan.
Three ways to get to drawings, each with its own trade-off.

The construction contract is the biggest cost, but not the only one.
Rule of thumb for a new detached house. Fees and charges can be far higher in some cities, so look yours up early.
One-time fees cities charge new homes to pay for roads, pipes and parks.
Usually priced by floor area or by construction value.
New water, sewer and power lines from the street to the house.
Interest, taxes and insurance on the land while you wait for permits.
Once the permit drawings are done, builders can price the same thing.

The city checks the drawings against zoning and the building code.
Structural, mechanical and civil engineers stamp their part of the set.
A fixed price shifts risk to the builder. Cost-plus is open-book, but the total can move.
The city inspects at footings, framing, insulation and the end of the job.
Many places let you hold back part of each payment until liens clear.
A final inspection, then you can move in.
Most delays come from finding a rule late.
A plan that is 1 m too wide fails the side setback.
Real lot lines and grades often differ from the old drawing.
A heritage or ravine rule can add months of review.
Fees and soft costs can add a quarter on top.
See the zone, setbacks, height and floor area for your lot, with the by-law cited.