Skip to content
Bucky
|

Products

  • Bucky AssetsNewAll your city's rules and data in one place.
  • Bucky ResearchFind more opportunities across your city.
  • Bucky PermittingReview permit applications in minutes.
  • Blog
  • About us
Log InBook a Demo
Bucky
|
Blog
  • Bucky AssetsNewAll your city's rules and data in one place.
  • Bucky ResearchFind more opportunities across your city.
  • Bucky PermittingReview permit applications in minutes.
About us
Log InBook a Demo
Selected for the first municipal cohort ofIVÉORead more →

Can I split my lot?

Splitting a lot means turning one parcel into two, each with its own title. Both new lots must meet the zone’s minimum frontage and minimum lot area, and the split needs approval: a consent or subdivision in Canada, a plat in the US. A big lot is a start, but it is the two minimums that decide.

  • Each new lot must meet the minimum frontage
  • Each new lot must meet the minimum area
  • Access and services have to work for both
  • A city, committee or approving officer signs off
A big lot that still can’t split
200 Parkway DrCedar Park, TX · Zone SRImagery: Esri World Imagery

Lot and zone minimums

Cedar Park Code § 11.03.061 · live in Bucky
Lot area
1,487 m²16,011 ft²
Width × depth
33.6 × 47.1 m110 × 154 ft
Min. frontage
30.48 m100 ft
Min. lot area
1,393.5 m²15,000 ft²
Frontage today
Pass
Area today
Pass
Lots allowed by area
11,487 ÷ 1,393.5 = 1.07
  • Each half, frontage16.8 m33.6 ÷ 2, about 55 ft
  • Each half, area744 m²1,487 ÷ 2, about 8,000 ft²
  • Frontage testFails16.8 m of the 30.48 m needed
  • Area testFails744 m² of the 1,393.5 m² needed

Halving the lot down the middle, before access, services and approvals. The lot would need about 2,787 m² (30,000 ft²) and 61 m of frontage to make two SR lots, unless it were rezoned.

Start with the numbers, then talk to a surveyor. If half the lot fails a minimum, the split needs a variance or a rezoning before anything else.

Bucky reads the zone minimums for an address and compares your lot to them. Check your lot.

10 free lookups / month With a free Bucky account

The two testsConsent or platTexas and CaliforniaBeyond the minimumsQuestions

The two tests, frontage and area.

Halve the lot and compare each half to the zone minimums. Here are three real lots.

Frontage is the width of the lot along the street. Lot area is the whole parcel. Most zones set a minimum for both, and a new lot has to meet each one. A wide, shallow lot can pass on frontage and fail on area. A deep, narrow lot often does the opposite.

Each half, as a share of the zone minimum

Frontage

3458 W 33rd AvVancouver · R1-1 · min 7.3 m
9.15 m125% · pass
320 Brunswick AveToronto · R · min 6 m
4.07 m68% · fail
200 Parkway DrCedar Park · SR · min 30.48 m
16.8 m55% · fail

Lot area

3458 W 33rd Avmin 306 m²
391 m²128% · pass
320 Brunswick Aveno area minimum on file
153 m²unknown
200 Parkway Drmin 1,393.5 m²
744 m²53% · fail
  • Half of the lot, meets the minimum
  • Half of the lot, falls short
  • Zone minimum (100%)

Lot sizes and minimums from live Bucky snapshots (lot conformity). Only the Vancouver lot clears both. A missing minimum is unknown, not a pass.

  • Frontage usually bites first

    On city lots, halving a 9 m frontage leaves 4.5 m, below most minimums.

  • Area: twice the minimum

    A quick screen. If the lot is under twice the zone minimum, two equal lots can’t both pass.

  • Unequal splits are allowed sometimes

    One bigger, one smaller lot can work if both still meet the minimums.

  • Corner and flag lots differ

    Some by-laws set other minimums for corner lots or lots behind another lot.

Consent or plat, who approves the split.

Canada and the US use different words and different bodies for the same job.

The approval path
WhereWhat it is called, and who decidesWhat they look at
Ontarioe.g. Toronto, OttawaA consent to sever, under the Planning Act. Decided by the Committee of Adjustment or the municipality.Often heard with minor variances for the new lots.Lot sizes against the zoning, the official plan, servicing, and the effect on neighbours.
British Columbiae.g. VancouverA subdivision, approved by the municipal approving officer and registered at the Land Title Office.Zoning minimums, road and lane access, servicing, and city conditions.
Texase.g. Austin, Cedar ParkA plat or replat, approved by the city or its planning commission, then recorded with the county.Austin added a faster infill plat in 2025.Lot standards in the code, street frontage, utilities, drainage and easements.
CaliforniastatewideA parcel map, or an SB 9 urban lot split that cities must approve without a hearing if it meets state rules.For SB 9: each lot at least 1,200 ft², a split no more uneven than 60/40.

General process only. Fees, notice and timing vary by city. Austin infill plat: City of Austin HOME Amendments page (applications from June 16, 2025). SB 9: California HCD fact sheet.

A surveyor with a tripod-mounted instrument on a site

What a split application usually needs

  • A survey or draft plan showing the new lot lines
  • Frontage and area of each new lot, against the zone
  • Existing buildings and their setbacks to the new line
  • How each lot gets water, sewer and driveway access
  • Trees, easements and any overlays on the land

Texas and California, smaller lots by law.

Some places have cut the minimum lot size, which turns more lots into split candidates.

Recent minimum lot size changes
RuleMinimumWhat changed
Austin HOME Phase 2SF-1, SF-2, SF-31,800 ft²about 167 m²One home on a lot of at least 1,800 ft², down from 5,750 ft². Adopted May 16, 2024; applications from Aug 16, 2024, citywide from Nov 16, 2024.Two- and three-unit uses keep the 5,750 ft² minimum.
Texas SB 15Large cities, new subdivisions3,000 ft²about 279 m²Cities over 150,000 people must allow small lots in new subdivisions of 5 acres or more. Caps setbacks at 15 ft front, 10 ft rear, 5 ft side, and parking at one space per home.Applies to applications from Sept 1, 2025.
California SB 9Single-family zones1,200 ft²about 111 m²An urban lot split into two lots of at least 40% each, with up to two homes on each. The owner signs that they will live in one home for three years.A lot split under SB 9 can’t be split again under SB 9.
Cedar Park SRFor comparison15,000 ft²1,393.5 m²Unchanged suburban minimum. The 200 Parkway Dr lot above needs twice this to split.

Sources: City of Austin, HOME Amendments; Texas Tribune and City of Dallas SB 15 information sheet; California HCD, Lot Splits and Duplexes (SB 9). Cedar Park figure from the code as read by Bucky. Check the current local rules before relying on these.

Beyond the minimums, what else can stop a split.

Passing frontage and area gets you to the table. These decide the rest.

  • Street access

    Each lot usually needs frontage on a public street, or a lane the city accepts.

  • Services

    Separate water, sewer and power for each lot, and room to run them.

  • The existing house

    It must still meet its setbacks from the new lot line, or come down.

  • Protected trees

    A tree on the new line can limit where a second house goes.

  • Floodplain and overlays

    Flood, ravine or heritage rules can add review or rule a split out.

  • Fees and dedications

    Parkland fees, development charges and survey costs, before you build.

See the overlays on your lot

Common questions

Does a big lot mean I can split it?

Not on its own. Each new lot must meet the zone minimums for frontage and area. A 16,000 ft² lot in a 15,000 ft² zone, like the Cedar Park example, can only hold one lot.

What is the difference between a severance and a subdivision?

In Ontario, a severance (consent) creates one or a few new lots without a full plan of subdivision. A subdivision creates many lots and new roads or services. In BC, most lot splits go through subdivision with the approving officer. In the US, both are done with a plat.

Can I split if my lot is just short of the minimum?

Sometimes, with a variance or a rezoning. In Ontario a consent is often heard together with minor variances for the new lots. Small shortfalls stand a better chance than large ones, and the decision is discretionary.

Does a passing check mean the split is approved?

No. It means the numbers allow it. Access, services, the existing building, trees and overlays still need review, and the city or committee makes the decision. Confirm with a planner or surveyor.

What if my city or the lot minimum is missing?

The checker only returns an area comparison where parcel coverage is live and the parcel area and a positive zone minimum are available. An unmapped city can be requested through Parcel Pioneer. A missing rule in a covered city gives an unknown result, not a rejection.

What does the free offer include?

You can try this area screen without an account. A free Bucky account includes 10 site lookups per month in covered cities.

Feasibility reports by city

Bucky is live in a growing set of Canadian and US cities, with new cities added based on demand. Here are the cities we currently serve.

159144684027
58 live cities1 city20+ cities, live or onboarding
Each dot is a live city, where the address lookup works. Tinted provinces and states have at least one city live or onboarding. The live city list is below. Also onboarding in Hamburg.

Texas zoning by address

  • Austin zoning map
  • Cedar Park zoning map
  • New Braunfels zoning map

Canada zoning by address

  • Toronto zoning map

Canada

  • Camrose
  • Burnaby
  • Columbia Shuswap, Electoral Area C
  • Columbia Shuswap, Electoral Area D
  • Columbia Shuswap, Electoral Area E
  • Columbia Shuswap, Electoral Area F
  • Columbia Shuswap, Electoral Area G
  • District of North Vancouver
  • Kamloops
  • North Vancouver
  • Port Moody
  • Salmon Arm
  • Sicamous
  • Vancouver
  • Moncton
  • Brampton
  • Cornwall
  • Hamilton
  • Markham
  • Mississauga
  • Oakville
  • Richmond Hill
  • Toronto
  • Vaughan
  • Charlottetown
  • Blainville
  • Sainte-Thérèse
  • Terrebonne
  • Côte-des-Neiges–Notre-Dame-de-Grâce
  • Laval
  • Le Plateau-Mont-Royal
  • Le Sud-Ouest
  • Mercier–Hochelaga-Maisonneuve
  • Montreal
  • Rosemont–La Petite-Patrie
  • Verdun
  • Ville-Marie
  • Villeray–Saint-Michel–Parc-Extension

United States

  • Citrus Heights
  • Los Angeles
  • Sonoma, California
  • Sonoma, California
  • Centennial
  • Denver
  • New London
  • Chicago
  • Portland
  • Baltimore
  • Bedford, Massachusetts
  • Cambridge
  • Gloucester
  • Salem
  • Minneapolis
  • Moose Lake
  • Henderson
  • Las Vegas
  • Bedford, New York
  • Brooklyn
  • Austin
  • Cedar Park
  • Houston
  • New Braunfels
  • San Antonio
  • Burlington
  • Pierce
  • Tacoma
  • Charleston
  • Cheyenne
  • Laramie

Don’t see your city? Enter your address above and we’ll confirm availability — or add it to the queue.

Check your lot against the minimums.

Bucky reads the zone’s frontage and area minimums for an address and compares your lot.

Book a demoTry a free search
Bucky

AI property analysis for local governments.

Ask AI about Bucky

ChatGPT logoChatGPTGemini logoGeminiClaude logoClaudeGrok logoGrokPerplexity logoPerplexity

Stay in the loop.

One email a week: new cities, what shipped, and the best of the blog.

Unsubscribe anytime. See our Privacy Policy.

Frequently asked
questions

Who makes the decision on a permit?

Your staff make every decision. Bucky prepares the analysis and your team issues the permit.

Where does Bucky’s information come from?

From your own bylaws, specification grids and public records. Every result cites the article or document it comes from.

What happens when a bylaw changes?

Bucky updates the rule system with your team and shows which lots and files the amendment affects.

Do we need to change our software?

No. Bucky Research is built from data you already publish, and Bucky Permitting connects to the software you already use.

How do we buy Bucky?

Most towns start with a 12-month engagement inside their contracting rules. Book a demo and we’ll walk your team through the steps.

Which cities does Bucky cover?

Bucky covers 700+ cities across Canada and the US. Depth depends on what each city publishes. If yours isn’t live yet, we map it during onboarding.

Is Bucky available in French?

Yes. The software, the reports and the support are available in English and French.

Platform

  • Bucky Research
  • Bucky Permitting
  • Bucky Assets
  • Address search
  • Bucky for government
  • Bucky for developers
  • Bucky MCP
  • Claude Code plugin
  • Chrome extension
  • Mac app
  • iPhone app
  • Docs & API

Free tools

  • What is my property zoned for?
  • What are my lot dimensions?
  • How many stories can I build?
  • What are my setbacks?
  • What fits in my courtyard?
  • Development charges by city
  • Equity waterfall calculator
  • Residual land value calculator
  • Site research cost calculator
  • All free tools

Development guides

  • How to build your home
  • Can I split my lot?
  • Building multi-unit
  • Building an ADU
  • Laneway & garden suites
  • Financing your first home
  • Pre-development software
  • What is highest and best use?
  • Development charges
  • Development timelines
  • What is MLI Select?

Zoning basics

  • What is floor area ratio?
  • What are setbacks?
  • What is a minor variance?
  • What is a zoning variance?
  • Committee of Adjustment
  • Glossary

Company

  • About us
  • Careers
  • Press
  • Blog
  • Newsletter
  • Book a demo
  • Request your city
  • Contact us
© 2026 Bucky AI Inc. · Montréal and Toronto
Log inTermsPrivacyData deletionllms.txtAGENTS.mdsitemap.mdrobots.txthumans.txt
LinkedInInstagramXYouTubeTikTok

One address at a time. Checking a list of sites? Book a demo and we will run it with you.

Try a sample address

Load a verified parcel from any currently supported city.