Skip to content
Bucky
|

Products

  • Bucky AssetsNewAll your city's rules and data in one place.
  • Bucky ResearchFind more opportunities across your city.
  • Bucky PermittingReview permit applications in minutes.
  • Blog
  • About us
Log InBook a Demo
Bucky
|
Blog
  • Bucky AssetsNewAll your city's rules and data in one place.
  • Bucky ResearchFind more opportunities across your city.
  • Bucky PermittingReview permit applications in minutes.
About us
Log InBook a Demo
Selected for the first municipal cohort ofIVÉORead more →

How to build your home

Building a house takes eight stages, from the first design you like to the day you break ground. Most of the money people lose is decided in the first three, before a designer draws a line. This guide walks through each stage in order, what it costs in time, and what to check about your lot before you pay anyone.

  • Know what your lot allows before design
  • Order surveys before drawings
  • Budget for soft costs, not only the build
  • Compare quotes on the same package
The eight stages, in months
Stage06121824Typical
01Explore designs2–4 weeks
02Define the project1–2 weeks
03Site feasibility1–2 weeks
04Surveys and site reports3–6 weeks
05Design2–4 months
06Permits and engineering3–9 months
07Tender4–8 weeks
08Build8–14 months
  • Bucky answers these from your address
  • Done with licensed pros

Rule of thumb for one detached house in a large Canadian or US city. Permit time varies the most from city to city.

Bucky isn’t your builder or your architect. It reads the zoning, lot and overlays for your address and cites the by-law, so you start stages 1 to 3 with facts instead of guesses.

Licensed surveyors, designers and engineers still sign the drawings. Book a free strategy call if you want help finding them.

Your lotSite reportsDesignCostsPermits and build

Your lot, read it before you design.

Four rules decide the size of the house: what the zone allows, setbacks, height and floor area.

Every lot sits in a zone, and the zoning by-law sets the box a house has to fit inside. Setbacks push the walls in from the lot lines, the height limit caps the roof, and a floor area limit caps the total floor space. A design that ignores one of them goes back to the drawing board at permit, after you have paid for it.

A real lot, read from the by-law
29 Wychwood AveToronto · Zone R (d0.6)Imagery: Esri World Imagery

Lot and zone

By-law 569-2013 · live in Bucky
Lot area
162.06 m²
Width × depth
8.7 × 20.0 m
Max height
10 m§ 10.10.40.10
Floor space index
0.6§ 10.10.40.40
Front · rear · side
6 · 7.5 · 0.9 m§ 10.10.40.70
Storeys
No zone limit
Min. frontage 6 m
Pass
Overlays checked
Heritage, ravine
  • Depth left after setbacks6.5 m20.0 − 6 front − 7.5 rear
  • Width left after setbacks6.9 m8.7 − 0.9 − 0.9
  • Footprint, at most45 m²6.9 × 6.5 m
  • Floor area allowed97 m²162.06 × 0.6, so 3 floors to use it

Before by-law exceptions. On this lot the setbacks, not the floor area limit, shape the house: a 45 m² footprint needs three floors under the 10 m height to reach the 97 m² allowed.

  • Zone and uses

    Whether a detached house, a duplex or a multiplex is allowed on the lot at all.

  • Setbacks

    How far walls sit from the front, rear and side lot lines.

  • Height

    A cap in metres or feet, sometimes with a storey limit too.

  • Floor area

    Total floor space as a multiple of the lot, called FAR, FSR or FSI.

  • Overlays

    Heritage, ravine, flood or tree rules that sit on top of the zone.

  • Services

    Water, sewer and power at the street, and the cost to connect.

Check your address

Site reports, the ground truth before drawings.

Zoning says what is allowed. These reports say what is actually there.

Reports a house usually needs
ReportWhat it tells youWhen you need it
Boundary surveyLand surveyorWhere your lot lines really are, and anything that crosses them.Almost alwaysSetbacks are measured from these lines.
Topographic surveyLand surveyorGrades, trees, existing buildings and where services enter.Almost alwaysHeight is often measured from grade.
Geotechnical reportGeotechnical engineerWhat the soil can carry, and the water table.OftenNeeded for foundations and basements.
Arborist reportCertified arboristWhich trees are protected and how close you can dig.If trees are nearMany cities protect trees on and next to the lot.
Environmental Phase IEnvironmental consultantPast uses that could have left contamination.If flaggedFormer gas stations, dry cleaners or fill.
Utility locateUtility companiesBuried gas, power and water lines before anyone digs.AlwaysFree in most places. Call before you dig.

Order these before design starts, so your designer works from real dimensions and not from a plot plan.

Design, pick a plan or hire a designer.

Three ways to get to drawings, each with its own trade-off.

Ways to design
RouteSpeedFit to your lotBest when
Pre-designed planWeeksAdapted to fit. Check it against your setbacks first.A standard lot and a clear budget.
Custom designerMonthsDrawn for your lot from the survey.A narrow, sloped or unusual lot.
Design-build firmMonthsDrawn for your lot, priced as it is drawn.You want one contract and one point of contact.
Two people reviewing a floor plan printed on paper

Bring these to your first design meeting

  • Your lot facts: zone, setbacks, height and floor area, with the by-law sections
  • The boundary and topographic surveys
  • An all-in budget, including soft costs
  • Rooms you need, and the ones you could live without
  • Three homes nearby you like, and why

Costs, budget for more than the build.

The construction contract is the biggest cost, but not the only one.

Where a home budget goes
Construction · 70–75%
Soft costs · 15–20%
Fees
Buffer
  • ConstructionLabour, materials and the builder’s fee, under the build contract.
  • Soft costsDesign, engineering, surveys, reports and project management.
  • Fees and chargesPermit fees, development charges and service connections. Varies most by city.
  • Contingency5 to 10% for what nobody saw coming. Keep it out of the build price.

Rule of thumb for a new detached house. Fees and charges can be far higher in some cities, so look yours up early.

  • Development charges

    One-time fees cities charge new homes to pay for roads, pipes and parks.

  • Permit fees

    Usually priced by floor area or by construction value.

  • Service connections

    New water, sewer and power lines from the street to the house.

  • Carrying costs

    Interest, taxes and insurance on the land while you wait for permits.

Permits and build, compare quotes, not guesses.

Once the permit drawings are done, builders can price the same thing.

From permit to keys

A tender package that gets comparable quotes

  • Permit drawings and the structural, mechanical and civil engineering
  • A finish schedule: windows, flooring, kitchen, fixtures
  • Site reports, so nobody prices the soil as a guess
  • Who pays for what: permits, connections, allowances
  • A start date and a target finish
A wood-framed house under construction with sheathing on the walls and roof
  • Building permit

    The city checks the drawings against zoning and the building code.

  • Engineering

    Structural, mechanical and civil engineers stamp their part of the set.

  • Fixed price or cost-plus

    A fixed price shifts risk to the builder. Cost-plus is open-book, but the total can move.

  • Inspections

    The city inspects at footings, framing, insulation and the end of the job.

  • Holdbacks

    Many places let you hold back part of each payment until liens clear.

  • Occupancy

    A final inspection, then you can move in.

Common mistakes, and how to skip them.

Most delays come from finding a rule late.

  • Buying a plan before checking the lot

    A plan that is 1 m too wide fails the side setback.

  • Designing from the plot plan

    Real lot lines and grades often differ from the old drawing.

  • Missing an overlay

    A heritage or ravine rule can add months of review.

  • Budgeting the build price only

    Fees and soft costs can add a quarter on top.

Start with your address.

See the zone, setbacks, height and floor area for your lot, with the by-law cited.

Book a demoTry a free search
Bucky

AI property analysis for local governments.

Ask AI about Bucky

ChatGPT logoChatGPTGemini logoGeminiClaude logoClaudeGrok logoGrokPerplexity logoPerplexity

Stay in the loop.

One email a week: new cities, what shipped, and the best of the blog.

Unsubscribe anytime. See our Privacy Policy.

Frequently asked
questions

Who makes the decision on a permit?

Your staff make every decision. Bucky prepares the analysis and your team issues the permit.

Where does Bucky’s information come from?

From your own bylaws, specification grids and public records. Every result cites the article or document it comes from.

What happens when a bylaw changes?

Bucky updates the rule system with your team and shows which lots and files the amendment affects.

Do we need to change our software?

No. Bucky Research is built from data you already publish, and Bucky Permitting connects to the software you already use.

How do we buy Bucky?

Most towns start with a 12-month engagement inside their contracting rules. Book a demo and we’ll walk your team through the steps.

Which cities does Bucky cover?

Bucky covers 700+ cities across Canada and the US. Depth depends on what each city publishes. If yours isn’t live yet, we map it during onboarding.

Is Bucky available in French?

Yes. The software, the reports and the support are available in English and French.

Platform

  • Bucky Research
  • Bucky Permitting
  • Bucky Assets
  • Address search
  • Bucky for government
  • Bucky for developers
  • Bucky MCP
  • Claude Code plugin
  • Chrome extension
  • Mac app
  • iPhone app
  • Docs & API

Free tools

  • What is my property zoned for?
  • What are my lot dimensions?
  • How many stories can I build?
  • What are my setbacks?
  • What fits in my courtyard?
  • Development charges by city
  • Equity waterfall calculator
  • Residual land value calculator
  • Site research cost calculator
  • All free tools

Development guides

  • How to build your home
  • Can I split my lot?
  • Building multi-unit
  • Building an ADU
  • Laneway & garden suites
  • Financing your first home
  • Pre-development software
  • What is highest and best use?
  • Development charges
  • Development timelines
  • What is MLI Select?

Zoning basics

  • What is floor area ratio?
  • What are setbacks?
  • What is a minor variance?
  • What is a zoning variance?
  • Committee of Adjustment
  • Glossary

Company

  • About us
  • Careers
  • Press
  • Blog
  • Newsletter
  • Book a demo
  • Request your city
  • Contact us
© 2026 Bucky AI Inc. · Montréal and Toronto
Log inTermsPrivacyData deletionllms.txtAGENTS.mdsitemap.mdrobots.txthumans.txt
LinkedInInstagramXYouTubeTikTok