Skip to content
Bucky
  • Bucky ResearchFind the properties where your project fits.
  • Bucky PermittingCheck every application against every rule in minutes.
|
|
Log InBook a Demo
Bucky
|
  • Bucky ResearchFind the properties where your project fits.
  • Bucky PermittingCheck every application against every rule in minutes.
Log InBook a Demo
Selected for the first municipal cohort ofIVÉORead more →

What is a minor variance?

A minor variance is Ontario’s permission to depart from the zoning by-law on one property. The by-law stays the same for every other lot. You apply to the Committee of Adjustment, which must find the request minor, desirable for the land, and consistent with the intent of the by-law and the official plan under Planning Act section 45.

  • Applies to one property, not the whole zone
  • Decided at a public hearing
  • Four findings, all of them needed
  • Does not change the by-law itself
A narrow Toronto lot, where variances are common
88 Glebeholme BlvdToronto · Zone RImagery: Esri World Imagery

Lot and zone

By-law 569-2013 · live in Bucky
Lot area
240.24 m²
Width × depth
7.0 × 36.6 m
Floor space index
0.6§ 10.10.40.40
Max height
10 m§ 10.10.40.10
Front · rear · side
6 · 7.5 · 0.9 m§ 10.10.40.70
Storeys
No zone limit
Min. frontage 6 m
Pass
Overlays checked
Heritage, ravine
Width inside setbacks5.2 m7.03 − 0.9 − 0.9
Floor area allowed144 m²240.24 × 0.6
Example request192 m²FSI 0.8, for an addition
Variance asked for+48 m²33% over the by-law

Lot facts are live. The 0.8 request is an example to show the math, not a real application on this property.

Know exactly what you are asking for. The committee rules on each by-law standard you miss, so the list has to be complete before you file.

Bucky lists the setbacks, height and floor area for an address with the sections cited, so you can see which rules a design misses. Check an address.

Four testsProcess and timelineFeesTypical asksvs severancevs US variance

The four tests, one sentence in the Act.

Section 45(1) puts them in a single sentence. Toronto and most practitioners list them as four findings.

The committee may authorize a variance that, in its opinion, is desirable for the appropriate development or use of the land, if the general intent and purpose of the by-law and of the official plan are maintained. The word “minor” in the power is read as its own test. Subsection (1.0.1) also lets the province or the city add criteria.

  1. 1
    It is minor

    Judged by impact as well as size. A small number can still have a large effect on a neighbour.

  2. 2
    Desirable for the land

    Appropriate development or use of this lot, in its setting.

  3. 3
    Keeps the intent of the by-law

    Why the rule exists, such as light, privacy or access, still holds.

  4. 4
    Keeps the intent of the official plan

    The request fits the plan’s policies for the area.

Planning Act, R.S.O. 1990, c. P.13, s. 45(1) and (1.0.1), as read on e-Laws. The Act does not number the tests. Failing any one is enough to refuse.

Process and timeline, what the Act fixes.

The Act sets a few hard clocks. The rest depends on how busy your committee is.

Statutory clocks, in days
Step
015304560
Rule
HearingAfter the application is received
Within 30 dayss. 45(4)
Notice of decisionSent to the applicant
Within 10 dayss. 45(10)
Appeal windowFrom the decision date
20 dayss. 45(12)
Decision finalIf no one appeals
Then permit

Read from the Planning Act on e-Laws. In practice the 30-day hearing clock rarely holds in large cities once a file is complete and circulated; plan for a few months from filing to a final decision. Rule of thumb.

  • File a complete package

    Toronto takes PDFs by email, with Form A and Form B from October 2026, plans and a zoning review.

  • Notice goes out

    The committee notifies neighbours and public bodies in the manner the regulation prescribes.

  • Public hearing

    The committee hears you and anyone for or against, then decides, often with conditions.

  • Appeals are narrower now

    Since 2022, only the applicant, the Minister, or a specified person or public body may appeal. In Toronto, appeals go to the Toronto Local Appeal Body.

Fees, Toronto in 2026.

Fees are set by each city. Toronto’s rise each year with a cost-of-living adjustment.

Minor variance fee by project type
Additions and alterationsExisting dwellings, three units or less
$2,228.98
New dwellingsThree units or less
$5,011.08
All other usesLarger residential, commercial, industrial, institutional
$6,485.59
After the factWork already built
2 × fee

City of Toronto, Committee of Adjustment forms, submission guidelines and fees, effective January 1, 2026. Up to 80% may be refunded on early withdrawal, and nothing once the Notice of Hearing is mailed. Drawings, a planner and a survey cost extra.

Typical asks, and the ones you no longer need.

Most requests on small lots are about floor area, side yards and rear yards. Some small shortfalls are now deemed to comply.

88 Glebeholme Blvd, by-law vs the 90% rule
StandardBy-lawDeemed to comply down toBelow that
Front setback6.0 m5.4 m No varianceMinor variance
Rear setback7.5 m6.75 m No varianceMinor variance
Side setback0.9 m0.81 m No varianceMinor variance
Floor space index0.6Not covered by the 90% ruleMinor varianceOr a rezoning if it is not minor
Height10 mNot coveredMinor variance

Planning Act s. 34(1.4) and O. Reg. 545/06, s. 1.1, as summarised on the live /minor-variance page: on a parcel of urban residential land outside the Greenbelt, a minimum setback is deemed to be 90% of the by-law distance. It does not touch height, coverage or parking. Confirm the lot qualifies.

  • Floor area

    The most common ask on small lots, often with a rear or third-storey addition.

  • Side setbacks

    A narrow lot leaves little room. Here the box is 5.2 m wide.

  • Height and main walls

    Asked for with additions that go up rather than back.

  • Parking and garden suites

    Spaces, access and the size or placement of an ancillary building.

Minor variance vs severance, two different asks in Toronto.

A variance bends a zoning rule for a building. A severance (consent) changes the lot itself.

Side by side, Toronto
Minor varianceSeverance (consent)
What it doesLets one property depart from a zoning standard such as setback, height or floor space index.Lets an owner split land into new lots, adjust a lot line, or create an easement or long lease.
StatutePlanning Act s. 45Planning Act s. 53
Who hears itCommittee of AdjustmentCommittee of Adjustment (same tribunal in Toronto)
Typical useA rear addition, third storey, garden suite, or multiplex that misses a numeric rule.Splitting a wide lot into two, or fixing a lot line. Often filed with variances for the new lots.
Does it rezone?No. The by-law stays the same for every other lot.No. Consent creates lots; a rezoning changes what the zone allows.

Source: Planning Act ss. 45 and 53; City of Toronto Committee of Adjustment purpose statement. Fees and timelines differ by application type.

Minor variance vs a US variance, different tests.

Both give one lot relief. The question the board asks is not the same.

Side by side
Ontario minor varianceUS zoning variance
Who decidesCommittee of AdjustmentBoard of zoning appeals or adjustment, or the body the ordinance names
Core testMinor, desirable, keeps the intent of the by-law and the official plan.Usually hardship or practical difficulty from conditions special to the lot.
Hardship needed?No. The Act does not ask for it.Often yes, especially for a use variance.
Use changesLimited. s. 45(2) covers some non-conforming and general-terms uses.Many states bar or restrict use variances. California forbids them.
AppealOntario Land Tribunal, or TLAB in Toronto, within 20 days.Usually to a court, by the state’s rules.

US examples from the live /zoning-variance page: Cal. Gov. Code § 65906, N.Y. Town Law § 267-b, Tex. Local Gov’t Code § 211.009.

Common questions

Does a minor variance change the zoning by-law?

No. The permission applies only to the property in the application. A zoning by-law amendment, or rezoning, is the application that changes the by-law.

Is a minor variance the same as a severance in Toronto?

No. A minor variance bends a zoning rule for one building. A severance, also called a consent, splits or adjusts the lot under Planning Act s. 53. Both are heard by Toronto’s Committee of Adjustment, and they are often filed together when a new lot also needs variances.

Is a minor variance the same across Canada?

No. Québec has the dérogation mineure, British Columbia the development variance permit and the board of variance, Calgary the relaxation and Edmonton the variance. Saskatchewan’s minor variance is limited to building distances, at no more than 10%.

How big can a minor variance be?

The Act sets no number. The committee weighs size and impact together, so a request is judged on its effect on the street and the neighbours, not only on the percentage.

When does a setback need no variance?

On urban residential land outside the Greenbelt, a minimum setback is deemed to be 90% of the by-law figure. A shortfall inside that deemed distance needs no variance. Height, coverage and parking are outside that rule.

Sources, statutes and city pages.

Primary links for the tests, timelines and fees on this page.

  • Planning Act, R.S.O. 1990, c. P.13, s. 45
  • O. Reg. 545/06, s. 1.1 (90% deemed setback)
  • City of Toronto: about the Committee of AdjustmentFour findings and hearing procedure
  • City of Toronto: Committee of Adjustment feesFees effective January 1, 2026

Related

  • Toronto Committee of Adjustment
  • Toronto zoning by address
  • What are development charges?
  • What is a zoning variance? (US)

See what your design misses.

Bucky reads the setbacks, height and floor area for an address, with each section cited.

Book a demoTry a free search
Bucky

Property intelligence for the building industry.

Ask AI about Bucky

ChatGPT logoChatGPTGemini logoGeminiClaude logoClaudeGrok logoGrokPerplexity logoPerplexity

Stay in the loop.

One email a week: new cities, what shipped, and the best of the blog.

Unsubscribe anytime. See our Privacy Policy.

Frequently asked
questions

What does Bucky do?

Bucky finds every property where your business fits. Tell us what you build, buy, or plan, and we build a list of matching properties in your area, refreshed every month. You choose what the list becomes: a file, a report, a map, or mail at the owner’s door.

What is a list?

Your search criteria applied to a place. For example: “lots where a garden suite fits” in Austin, or “multiplex-ready lots under 2 acres” in Toronto. Bucky checks every parcel and keeps the ones that match.

Who is Bucky for?

Anyone whose work starts with the right property. Product sellers (ADUs, pools, solar, prefab) use it to reach owners. Developers and investors use it to find sites before they list. Cities and economic development offices use it to show what can be built and attract projects.

Where does the data come from, and can I trust it?

Every fact is cited to its public source, down to the section of the zoning bylaw, so you can defend it with a client or a planner. When a fact isn’t published, Bucky shows it as not found instead of guessing.

Which cities does Bucky cover?

Bucky covers 700+ cities across Canada and the US. Depth depends on what each city publishes. If your city isn’t live yet, request it and we’ll map it.

How much does it cost? Can I try it first?

Yes. The Free plan searches every city Bucky covers and keeps 3 lists with filters, plus as many lists as you fill by hand. Paid plans start at $29 a month for more lists with filters. Reports and postcards are optional, and you pay for them only when you order them.

Do I need to install anything?

No. Bucky runs in your browser. It also works in Claude and ChatGPT, in Chrome next to the listing you’re reading, and on Mac and iPhone.

Platform

  • How it works
  • Postcards
  • Blog
  • Address search
  • City search
  • Features
  • Reports
  • Sample report
  • Data methodology
  • Pricing
  • Book a demo
  • Pre-development software

Product & Integrations

  • Bucky Research
  • Bucky Permitting
  • Bucky MCP
  • Claude Code plugin
  • Chrome extension
  • Mac app
  • iPhone app
  • Docs & API

Free tools

  • All free tools
  • What is my property zoned for?
  • What are my lot dimensions?
  • How many stories can I build?
  • What are my setbacks?
  • What fits in my courtyard?
  • Development charges by city
  • Equity waterfall calculator
  • Residual land value calculator
  • Site research cost calculator

Built for

  • Developers
  • Architects
  • Builders
  • Designers
  • Suppliers
  • Real estate
  • Lenders
  • Building products
  • Government
  • Institutions

Popular guides

  • How to build your home
  • Can I split my lot?
  • Building multi-unit
  • Building a midrise
  • Building an ADU
  • Laneway & garden suites
  • Building a garage
  • Building a shed
  • Building a greenhouse
  • Building a spa
  • Financing your first home

Learn the basics

  • What is floor area ratio?
  • What are setback requirements?
  • What is lot coverage?
  • What is a minor variance?
  • What is a zoning variance?
  • What is highest and best use?
  • Development charges
  • Development timelines
  • MLI Select (CMHC)
  • Committee of Adjustment
  • Glossary

Popular markets

  • Toronto
  • Vancouver
  • Montréal
  • Austin
  • Chicago
  • Brooklyn
  • Los Angeles
  • Denver
  • Minneapolis
  • All cities we cover
  • Get notified for your city

Company & support

  • About us
  • Careers
  • Press
  • Read the blog
  • What’s new
  • Newsletter
  • Merch
  • Ambassadors
  • Students
  • Help & support
  • Contact us
© 2026 Bucky AI Inc. · Montréal and Toronto
Log inTermsPrivacyData deletionllms.txtAGENTS.mdsitemap.mdrobots.txthumans.txt
LinkedInInstagramXYouTubeTikTok