How long does development take?

From the first site search to the day people move in, a small infill project often takes about two years and a mid-rise that needs a rezoning often takes five or more. Construction is rarely the longest part. The approvals in the middle are, and they vary the most from city to city. The biggest single lever is whether the project is allowed as of right.

  • As of right skips the longest step
  • Phases overlap, they don’t queue
  • Some approvals have a legal clock
  • Most delays come from a rule found late
Site search to occupancy, in months
Phase01224364860Rule of thumb
Small infill Fourplex, allowed as of right
01Site search and feasibility1–2 months
02Purchase and due diligence1–3 months
03Design and engineering3–6 months
04Building permit3–9 months
05Construction10–14 months
06Occupancyat month ~25
Mid-rise Six storeys, needs a rezoning
01Site search and feasibility2–3 months
02Purchase and due diligence3–4 months
03Pre-application and studies4–6 months
04Rezoning12–24 months
05Site plan6–12 months
06Building permit and tender4–8 months
07Construction18–30 months
08Occupancyat month ~60
  • Bucky answers this from an address
  • Approvals, where most delays happen
  • Done with professionals and builders

Rule of thumb for a large Canadian or US city, not a schedule for any municipality. Bars overlap because teams start the next phase before the last one ends.

The fastest month is the one you don’t spend on the wrong site. Finding a zoning problem at permit stage can cost a year. Finding it at site search costs an afternoon.

Bucky reads the zoning, envelope and lot minimums for an address, with sections cited, so phase 01 takes days. Check an address.

The phasesApprovals that delayLegal clocksA real lotGo faster

The phases, what happens in each.

The same steps apply to a fourplex and a mid-rise. The approvals in the middle are what stretch.

From site search to occupancy
PhaseWhat happensWhat it produces
Site search and feasibilityScreen lots against zoning, size, overlays and price. Test a few unit counts.A short list and a go or no-go for each site.
Purchase and due diligenceOffer with conditions. Title, survey, environmental and geotechnical checks.A firm deal, or a reason to walk away.
Studies and designArchitect, planner and engineers. Traffic, servicing or shadow studies if needed.Drawings and reports for the application.
ApprovalsRezoning, variance or site plan if needed, then the building permit.The right to build what you drew.
Tender and financingBuilders price the permit set. The lender commits construction financing.A contract and a loan.
Construction and occupancyBuild, inspect at each stage, final inspection.An occupancy permit and keys.

Approvals that cause delays, and why they slip.

Each extra approval adds its own application, circulation, revisions and, often, a public meeting.

Common approvals, by how much time they add
ApprovalWhen you need itRule of thumbWhy it slips
Official plan or comprehensive plan amendmentThe use or density isn’t in the plan12–24+ monthsCouncil decision, public meetings, possible appeals
RezoningThe zone doesn’t allow the project9–24 monthsStudies, resubmissions, council calendar
Site planMost multi-unit and commercial projects3–12 monthsRounds of comments from many departments
Minor variance or variationA small miss on a setback, height or lot minimum2–6 monthsHearing schedule and notice periods
Heritage, tree or ravine reviewAn overlay applies to the lot1–6 monthsA separate review, often found late
Building permitEvery project1–9 monthsIncomplete drawings and code comments

Rules of thumb, not sourced averages. Appeals, such as to Ontario’s Land Tribunal, can add a year or more.

Legal clocks, some approvals have a deadline.

A few provinces and states set how long a city has to decide. Real reviews often run longer.

Statutory decision periods, in days
  • Plat, TexasLocal Gov’t Code 212.009
    30 days
  • Site plan, OntarioPlanning Act
    60 days
  • Zoning by-law amendment, OntarioPlanning Act
    90 days
  • Official plan + rezoning, OntarioPlanning Act, combined
    120 days

In Ontario, missing the period lets the applicant appeal for non-decision; it does not approve the project. Texas requires a city to approve, conditionally approve or disapprove a plat within 30 days of filing. Clocks start only once an application is complete. Check the current statute before relying on a date.

  • British Columbia

    Since Bill 44, many residential rezonings that match the official community plan skip the public hearing.

  • A complete application

    Pre-application meetings tell you which studies the city will ask for, before the clock starts.

A real lot, one failed minimum adds a step.

A lot that misses a zoning minimum can need a variation before anything else moves.

1878 N Leavitt St, Chicago
1878 N Leavitt StChicago · Logan Square · RS-3Imagery: Esri World Imagery

Lot and zone

Chicago Zoning Ordinance · live in Bucky
Lot area
223.6 m²about 2,407 ft²
Width × depth
7.34 × 30.51 m
Permitted homes
Detached or two-unit§ 17-2-0207
Floor area ratio
0.9§ 17-2-0304-A
Max height
9.14 m (30 ft)§ 17-2-0311-A
Rear · side setback
9.15 · 0.73 m§ 17-2-0306-C, 0309-A
Min. lot area 2,500 ft²
Fail232.3 m² required
Parking
2 per unitTransit exceptions unresolved

Live Bucky snapshot. The lot is about 93 ft² short of the RS-3 minimum. Older lots of record can have relief, so confirm with the city before you plan around a variation. Either way, you want to know this at phase 01, not at permit.

Go faster, without cutting corners.

Most time is saved before an application is filed.

What shortens a timeline
Two tower cranes over a mid-rise apartment building under construction

Habits that save months

  • Pick sites where the project is allowed as of right
  • Check overlays and lot minimums before you offer
  • Book a pre-application meeting and file complete
  • Order surveys and site reports during due diligence
  • Run design and financing in parallel with approvals
  • Answer comments in one full resubmission, not many
Read the staged decision path for institutions

Common questions

What is the longest part of development?

For projects that need a rezoning, usually the approvals. For projects allowed as of right, usually construction. That is why checking what is already allowed saves the most time.

Does a legal deadline mean approval by that date?

No. In Ontario, a missed decision period lets you appeal for non-decision, which takes time of its own. The clock also starts only once the application is complete.

Can phases run at the same time?

Yes, and they should. Design, financing and permit drawings often overlap with approvals. The risk is paying for work that changes if the approval does.

Are these durations guaranteed?

No. They are rules of thumb. Every city, site and project changes the path. Ask the municipality about current review times before you commit to a schedule.

Start the clock on the right site.

Bucky reads the zoning, lot minimums and overlays for an address, so you know what is allowed as of right.

Book a demoTry a free search
Bucky

Property intelligence for the building industry.

Ask AI about Bucky

ChatGPT logoChatGPTGemini logoGeminiClaude logoClaudeGrok logoGrokPerplexity logoPerplexity

Stay in the loop.

One email a week: new cities, what shipped, and the best of the blog.

Unsubscribe anytime. See our Privacy Policy.

Frequently asked
questions

What does Bucky do?

Bucky finds every property where your business fits. Tell us what you build, buy, or plan, and we build a list of matching properties in your area, refreshed every month. You choose what the list becomes: a file, a report, a map, or mail at the owner’s door.

What is a list?

Your search criteria applied to a place. For example: “lots where a garden suite fits” in Austin, or “multiplex-ready lots under 2 acres” in Toronto. Bucky checks every parcel and keeps the ones that match.

Who is Bucky for?

Anyone whose work starts with the right property. Product sellers (ADUs, pools, solar, prefab) use it to reach owners. Developers and investors use it to find sites before they list. Cities and economic development offices use it to show what can be built and attract projects.

Where does the data come from, and can I trust it?

Every fact is cited to its public source, down to the section of the zoning bylaw, so you can defend it with a client or a planner. When a fact isn’t published, Bucky shows it as not found instead of guessing.

Which cities does Bucky cover?

Bucky covers 700+ cities across Canada and the US. Depth depends on what each city publishes. If your city isn’t live yet, request it and we’ll map it.

How much does it cost? Can I try it first?

Yes. The Free plan searches every city Bucky covers and keeps 3 lists with filters, plus as many lists as you fill by hand. Paid plans start at $29 a month for more lists with filters. Reports and postcards are optional, and you pay for them only when you order them.

Do I need to install anything?

No. Bucky runs in your browser. It also works in Claude and ChatGPT, in Chrome next to the listing you’re reading, and on Mac and iPhone.

Platform

  • How it works
  • Postcards
  • Blog
  • Address search
  • City search
  • Features
  • Reports
  • Sample report
  • Data methodology
  • Pricing
  • Book a demo
  • Pre-development software

Product & Integrations

  • Bucky Research
  • Bucky Permitting
  • Bucky MCP
  • Claude Code plugin
  • Chrome extension
  • Mac app
  • iPhone app
  • Docs & API

Free tools

  • All free tools
  • What is my property zoned for?
  • What are my lot dimensions?
  • How many stories can I build?
  • What are my setbacks?
  • What fits in my courtyard?
  • Development charges by city
  • Equity waterfall calculator
  • Residual land value calculator
  • Site research cost calculator

Built for

  • Developers
  • Architects
  • Builders
  • Designers
  • Suppliers
  • Real estate
  • Lenders
  • Building products
  • Government
  • Institutions

Popular guides

  • How to build your home
  • Can I split my lot?
  • Building multi-unit
  • Building a midrise
  • Building an ADU
  • Laneway & garden suites
  • Building a garage
  • Building a shed
  • Building a greenhouse
  • Building a spa
  • Financing your first home

Learn the basics

  • What is floor area ratio?
  • What are setback requirements?
  • What is lot coverage?
  • What is a minor variance?
  • What is a zoning variance?
  • What is highest and best use?
  • Development charges
  • Development timelines
  • MLI Select (CMHC)
  • Committee of Adjustment
  • Glossary

Popular markets

  • Toronto
  • Vancouver
  • Montréal
  • Austin
  • Chicago
  • Brooklyn
  • Los Angeles
  • Denver
  • Minneapolis
  • All cities we cover
  • Get notified for your city

Company & support

  • About us
  • Careers
  • Press
  • Read the blog
  • What’s new
  • Newsletter
  • Merch
  • Ambassadors
  • Students
  • Help & support
  • Contact us
© 2026 Bucky AI Inc. · Montréal and Toronto
Log inTermsPrivacyData deletionllms.txtAGENTS.mdsitemap.mdrobots.txthumans.txt
LinkedInInstagramXYouTubeTikTok