Glossary
Key terms for homeowners, professionals, and agents working with Bucky on residential pre-development in Canada.
- Pre-development
- Everything that happens before construction starts: site exploration, zoning checks, design intent, budgeting, and professional matching.
- Zoning
- Municipal rules that define what can be built on a parcel — permitted uses, height, setbacks, density (FAR/FSR), and parking.
- Feasibility
- Whether a proposed project can likely comply with zoning and site constraints, often summarized in a feasibility report or score.
- Setback
- Minimum distance a structure must be set back from property lines or rights-of-way.
- FAR / FSR
- Floor area ratio (also floor space ratio): total buildable floor area divided by lot area. Higher FAR allows more built area on the same lot.
- ADU
- Accessory dwelling unit — a secondary residential unit on the same lot as a primary home (laneway house, basement suite, etc.).
- Buildable envelope
- The three-dimensional volume within which a structure may be placed given setbacks, height limits, and coverage rules.
- Parcel
- A defined land lot with a legal boundary, often identified by a municipal lot number or PIN.
- Geo-division
- A Bucky municipal boundary used to attach zoning data, feasibility tools, and local regulations to a site.
- Design marketplace
- Bucky's catalogue of build-ready residential designs that homeowners can browse, save, and connect to professionals.