Bucky Blog
Texas SB 840: Commercial Land, Housing Rules and Austin Lot Examples
What Texas SB 840 allows on commercial land, its limits and exclusions, and three real Austin lot examples to guide your site research.

A commercial zone label is the beginning of an SB 840 site check. It does not establish that a lot is eligible, that a building can be converted or that a proposed unit count will fit.
Texas SB 840 creates a by-right residential pathway on qualifying commercial land in covered cities. This guide separates the statutory rules from three real Austin screening examples.
What changed
SB 840 took effect September 1, 2025. Its new-development provisions apply to projects initiated on or after that date; its conversion provisions apply when a building permit was submitted on or after that date. Covered cities must allow qualifying multifamily or mixed-use residential where zoning permits office, commercial, retail, warehouse or mixed use, subject to exclusions. They cannot require rezoning or another discretionary land-use approval to allow that use. A compliant project receives administrative approval. [SB 840 §§4–5; Chapter 218 as added by SB 840, §§218.101(a)–(b), 218.102(b)] Source
Multifamily means three or more dwelling units within one or more buildings. Mixed-use residential requires residential uses to occupy at least 65% of the development’s total square footage. A duplex alone does not meet the multifamily definition. [SB 840 §218.001(2)–(3)] Source
Which cities
The city must have more than 150,000 people and be wholly or partly in a county with more than 300,000 people. Use the most recent federal decennial census, not annual estimates. [SB 840 §218.002; Government Code §311.005(3)] Source
Austin and San Antonio meet the population test. Austin publishes its own implementation guidance. Texas Demographic Center’s 2020 Census table records San Antonio at 1,434,625 and Bexar County at 2,009,324. City coverage does not establish eligibility for an individual lot. Source
What the city can still ask for
These rules took effect September 1, 2025, for projects within SB 840’s application dates. Citations below refer specifically to Chapter 218 as added by SB 840. SB 2477 added a separate Chapter 218 with overlapping section numbers.
- Density: a city cannot impose a limit below the greater of 36 units per acre or the highest residential density allowed in the municipality. This constrains municipal limits; it does not promise a site-specific yield. [§218.102(a)(1)(A)] Source
- Height: the greater of 45 feet or the highest height applicable to an office, commercial, retail or warehouse development on the site. [§218.102(a)(1)(B)] Source
- Setbacks and buffers: no more restrictive than the lesser of 25 feet or the applicable requirement for those nonresidential developments on the site. Twenty-five feet is not a mandatory setback. [§218.102(a)(1)(C)] Source
- Parking: a city cannot require more than one space per dwelling or a multilevel parking structure. It also cannot impose a floor-area-ratio restriction. This does not require an applicant to build one parking space per dwelling. [§218.102(a)(2)–(3)] Source
Generally applicable building codes, water and sewer access requirements, stormwater mitigation and historic preservation rules remain relevant, subject to the chapter’s exceptions. Water-quality protections, short-term rental rules and voluntary density-bonus programs are also preserved. [§218.003] Source
Austin’s published implementation page states up to 54 units per acre, the greater-of-45-feet height rule, the lesser-of-25-feet setback rule, and no FAR cap. Do not treat 36 units per acre as Austin’s universal ceiling. Source
Outside an area zoned for mixed-use residential, a multifamily project cannot be required to contain nonresidential uses. [SB 840 §218.102(a)(4)] Source
Where it doesn't apply
The by-right use provision excludes zones that allow heavy industrial uses; land within 1,000 feet of an existing heavy industrial use or development site; land within 3,000 feet of an airport or military base; and city-designated clear zones or accident potential zones. Check each test separately. [§218.101(c)] Source
Check recorded restrictions separately. Companion SB 2477 expressly preserves private restrictions and certain municipal enforcement of deed restrictions. Do not treat a zoning pathway as title clearance. [SB 2477 §1, Chapter 218 §218.003] Source
Old buildings get a path too
SB 840’s conversion subchapter addresses office, retail and warehouse buildings constructed at least five years before the proposed conversion start. At least 65% of the building and each occupiable floor must meet its residential conversion requirement. Its protections address traffic studies, additional parking, utility capacity, design requirements and certain impact fees. Do not apply conversion protections indiscriminately to new construction. [SB 840 §§218.202–218.204] Source
SB 2477 separately addresses office conversions. Its reconciliation clause requires the enactments to be harmonized and gives SB 840 control over irreconcilable conflicts. Identify the statute and project type before relying on an exemption. [SB 2477 §§3–5] Source
What it means for a lot: three Austin examples
Bucky’s live screen on November 6, 2026 returned 733 stored parcel records in GR, LR or GO base zones, including variants, with areas of 20,000 to 43,560 square feet. Default filters excluded known public owners and assessed values below $100,000; unknown owner classes remained. Facts were refreshed November 4. These are screening candidates, not a count of eligible SB 840 sites or properties offered for sale.
7401 Old Bee Caves Road
Parcel 308765: 43,543 square feet; GO-CO-NP; assessor-coded office use. Bucky returned conditional-overlay, neighborhood-plan and aquifer overlays. Review the actual overlay ordinance and water-quality constraints. The primary zoning assignment covers 97.5% of the parcel, so confirm the boundary before assuming a uniform entitlement.
8001 Shoal Creek Boulevard
Parcel 773054: 43,538 square feet; GR; assessor-coded medical office use. This is an existing-building research candidate. Its stored 1984 construction year is a lead, not confirmation that a conversion qualifies or is feasible.
6107 Hudson Street
Parcel 196434: 43,534 square feet; GR-MU-NP; assessor-coded vacant land. MU is already present, so ask which standards SB 840 changes rather than assuming it first permits residential use here. Review the neighborhood plan and site conditions.
For all three examples, heavy-industry proximity, airport and military-base distances, clear or accident potential zones, title restrictions and permit history remain unchecked. Missing overlays do not establish eligibility. Bucky’s stored 1.0 FAR and associated buildable-area figures are base-zone output, not SB 840 entitlements, and are not used here to calculate unit yield.
Find similar Austin commercial lots in City Search. The link opens the search brief above; review its interpreted criteria before running it. It is a commercial-lot search, not an automated SB 840 eligibility test. Open City Search
San Antonio examples
San Antonio meets the population test. Bucky examples will be added after its zoning and overlay data pass the required live screening checks. No San Antonio lot is represented here as eligible.
How to check a lot in five steps
- Confirm the jurisdiction and population thresholds using the federal decennial census.
- Check the full zoning classification and ordinance, including combining districts and conditional overlays.
- Measure distances to existing heavy industry, airports and military bases, and check clear and accident potential zones.
- Review title restrictions, historic designations, access, drainage, utilities and applicable building requirements.
- Ask the city to confirm the relevant development or conversion pathway and applicable standards.
The next underwriting step is a site-specific envelope and cost study. A by-right use can remove a discretionary approval step while leaving substantial site and building work.
Bucky’s cited zoning output supports research. It does not replace a site-specific eligibility determination.
Related Texas guides
See the Texas zoning laws hub for SB 840, SB 15, HB 24, ETJ and city pages. Also: Houston Has No Zoning. Here's What Actually Limits Your Lot., Before You Buy a Texas Lot: A 5 Minute Check, and Factory-Built in Texas: How Manufactured, Modular and Tiny Homes Get Approved.
Frequently asked questions
- What is Texas SB 840?
- A Texas housing law effective September 1, 2025. It creates a by-right multifamily and mixed-use residential pathway on qualifying commercial land in covered cities, subject to statutory exclusions. See SB 840 §§4–5 and its version of Local Government Code §218.101.
- Which cities does SB 840 apply to?
- Cities with more than 150,000 people located wholly or partly in a county with more than 300,000 people. Austin and San Antonio meet the test. Use federal decennial census population, not annual estimates. See SB 840 §218.002 and Government Code §311.005(3).
- Does SB 840 override zoning?
- It overrides specified municipal restrictions for qualifying projects, including a rezoning requirement to allow the covered residential use. It does not remove all development requirements or establish eligibility from a zone label alone. See SB 840 §§218.003, 218.101 and 218.102.
Sources
- 1.
SB 840 enrolled statute: §§4–5 and Chapter 218
Accessed November 6, 2026
- 2.
Accessed November 6, 2026
- 3.
Accessed November 6, 2026
- 4.
SB 2477 enrolled statute: reconciliation clause
Accessed November 6, 2026
- 5.
Government Code §311.005(3): population
Accessed November 6, 2026
- 6.
2020 Census: San Antonio and Bexar County
Accessed November 6, 2026



