Passer au contenu
Bucky
|

Produits

  • Bucky AssetsNouveauToutes les règles et les données de votre ville au même endroit.
  • Bucky ResearchTrouvez plus d’occasions partout dans votre ville.
  • Bucky PermittingAnalysez les demandes de permis en quelques minutes.
  • Blogue
  • À propos
Se connecterRéserver une démo
Bucky
|
Blogue
  • Bucky AssetsNouveauToutes les règles et les données de votre ville au même endroit.
  • Bucky ResearchTrouvez plus d’occasions partout dans votre ville.
  • Bucky PermittingAnalysez les demandes de permis en quelques minutes.
À propos
Se connecterRéserver une démo
Sélectionné pour la première cohorte municipale d’IVÉOEn savoir plus →

How to build your home

Building a house takes eight stages, from the first design you like to the day you break ground. Most of the money people lose is decided in the first three, before a designer draws a line. This guide walks through each stage in order, what it costs in time, and what to check about your lot before you pay anyone.

  • Know what your lot allows before design
  • Order surveys before drawings
  • Budget for soft costs, not only the build
  • Compare quotes on the same package
The eight stages, in months
Stage06121824Typical
01Explore designs2–4 weeks
02Define the project1–2 weeks
03Site feasibility1–2 weeks
04Surveys and site reports3–6 weeks
05Design2–4 months
06Permits and engineering3–9 months
07Tender4–8 weeks
08Build8–14 months
  • Bucky answers these from your address
  • Done with licensed pros

Rule of thumb for one detached house in a large Canadian or US city. Permit time varies the most from city to city.

Bucky isn’t your builder or your architect. It reads the zoning, lot and overlays for your address and cites the by-law, so you start stages 1 to 3 with facts instead of guesses.

Licensed surveyors, designers and engineers still sign the drawings. Book a free strategy call if you want help finding them.

Your lotSite reportsDesignCostsPermits and build

Your lot, read it before you design.

Four rules decide the size of the house: what the zone allows, setbacks, height and floor area.

Every lot sits in a zone, and the zoning by-law sets the box a house has to fit inside. Setbacks push the walls in from the lot lines, the height limit caps the roof, and a floor area limit caps the total floor space. A design that ignores one of them goes back to the drawing board at permit, after you have paid for it.

A real lot, read from the by-law
29 Wychwood AveToronto · Zone R (d0.6)Imagery: Esri World Imagery

Lot and zone

By-law 569-2013 · live in Bucky
Lot area
162.06 m²
Width × depth
8.7 × 20.0 m
Max height
10 m§ 10.10.40.10
Floor space index
0.6§ 10.10.40.40
Front · rear · side
6 · 7.5 · 0.9 m§ 10.10.40.70
Storeys
No zone limit
Min. frontage 6 m
Pass
Overlays checked
Heritage, ravine
  • Depth left after setbacks6.5 m20.0 − 6 front − 7.5 rear
  • Width left after setbacks6.9 m8.7 − 0.9 − 0.9
  • Footprint, at most45 m²6.9 × 6.5 m
  • Floor area allowed97 m²162.06 × 0.6, so 3 floors to use it

Before by-law exceptions. On this lot the setbacks, not the floor area limit, shape the house: a 45 m² footprint needs three floors under the 10 m height to reach the 97 m² allowed.

  • Zone and uses

    Whether a detached house, a duplex or a multiplex is allowed on the lot at all.

  • Setbacks

    How far walls sit from the front, rear and side lot lines.

  • Height

    A cap in metres or feet, sometimes with a storey limit too.

  • Floor area

    Total floor space as a multiple of the lot, called FAR, FSR or FSI.

  • Overlays

    Heritage, ravine, flood or tree rules that sit on top of the zone.

  • Services

    Water, sewer and power at the street, and the cost to connect.

Check your address

Site reports, the ground truth before drawings.

Zoning says what is allowed. These reports say what is actually there.

Reports a house usually needs
ReportWhat it tells youWhen you need it
Boundary surveyLand surveyorWhere your lot lines really are, and anything that crosses them.Almost alwaysSetbacks are measured from these lines.
Topographic surveyLand surveyorGrades, trees, existing buildings and where services enter.Almost alwaysHeight is often measured from grade.
Geotechnical reportGeotechnical engineerWhat the soil can carry, and the water table.OftenNeeded for foundations and basements.
Arborist reportCertified arboristWhich trees are protected and how close you can dig.If trees are nearMany cities protect trees on and next to the lot.
Environmental Phase IEnvironmental consultantPast uses that could have left contamination.If flaggedFormer gas stations, dry cleaners or fill.
Utility locateUtility companiesBuried gas, power and water lines before anyone digs.AlwaysFree in most places. Call before you dig.

Order these before design starts, so your designer works from real dimensions and not from a plot plan.

Design, pick a plan or hire a designer.

Three ways to get to drawings, each with its own trade-off.

Ways to design
RouteSpeedFit to your lotBest when
Pre-designed planWeeksAdapted to fit. Check it against your setbacks first.A standard lot and a clear budget.
Custom designerMonthsDrawn for your lot from the survey.A narrow, sloped or unusual lot.
Design-build firmMonthsDrawn for your lot, priced as it is drawn.You want one contract and one point of contact.
Two people reviewing a floor plan printed on paper

Bring these to your first design meeting

  • Your lot facts: zone, setbacks, height and floor area, with the by-law sections
  • The boundary and topographic surveys
  • An all-in budget, including soft costs
  • Rooms you need, and the ones you could live without
  • Three homes nearby you like, and why

Costs, budget for more than the build.

The construction contract is the biggest cost, but not the only one.

Where a home budget goes
Construction · 70–75%
Soft costs · 15–20%
Fees
Buffer
  • ConstructionLabour, materials and the builder’s fee, under the build contract.
  • Soft costsDesign, engineering, surveys, reports and project management.
  • Fees and chargesPermit fees, development charges and service connections. Varies most by city.
  • Contingency5 to 10% for what nobody saw coming. Keep it out of the build price.

Rule of thumb for a new detached house. Fees and charges can be far higher in some cities, so look yours up early.

  • Development charges

    One-time fees cities charge new homes to pay for roads, pipes and parks.

  • Permit fees

    Usually priced by floor area or by construction value.

  • Service connections

    New water, sewer and power lines from the street to the house.

  • Carrying costs

    Interest, taxes and insurance on the land while you wait for permits.

Permits and build, compare quotes, not guesses.

Once the permit drawings are done, builders can price the same thing.

From permit to keys

A tender package that gets comparable quotes

  • Permit drawings and the structural, mechanical and civil engineering
  • A finish schedule: windows, flooring, kitchen, fixtures
  • Site reports, so nobody prices the soil as a guess
  • Who pays for what: permits, connections, allowances
  • A start date and a target finish
A wood-framed house under construction with sheathing on the walls and roof
  • Building permit

    The city checks the drawings against zoning and the building code.

  • Engineering

    Structural, mechanical and civil engineers stamp their part of the set.

  • Fixed price or cost-plus

    A fixed price shifts risk to the builder. Cost-plus is open-book, but the total can move.

  • Inspections

    The city inspects at footings, framing, insulation and the end of the job.

  • Holdbacks

    Many places let you hold back part of each payment until liens clear.

  • Occupancy

    A final inspection, then you can move in.

Common mistakes, and how to skip them.

Most delays come from finding a rule late.

  • Buying a plan before checking the lot

    A plan that is 1 m too wide fails the side setback.

  • Designing from the plot plan

    Real lot lines and grades often differ from the old drawing.

  • Missing an overlay

    A heritage or ravine rule can add months of review.

  • Budgeting the build price only

    Fees and soft costs can add a quarter on top.

Start with your address.

See the zone, setbacks, height and floor area for your lot, with the by-law cited.

Book a demoTry a free search
Bucky

L’analyse immobilière par IA pour les municipalités.

Demandez à l’IA à propos de Bucky

Logo ChatGPTChatGPTLogo GeminiGeminiLogo ClaudeClaudeLogo GrokGrokLogo PerplexityPerplexity

Restez à l’affût.

Un courriel par semaine : les nouvelles villes, ce qui a été lancé et le meilleur du blog.

Désabonnement en tout temps. Consultez notre politique de confidentialité.

Questions
fréquentes

Qui prend la décision sur un permis ?

Votre personnel prend chaque décision. Bucky prépare l’analyse et votre équipe délivre le permis.

D’où viennent les informations de Bucky ?

De vos propres règlements, grilles de spécifications et registres publics. Chaque résultat cite l’article ou le document dont il provient.

Que se passe-t-il quand un règlement change ?

Bucky met à jour le système de règles avec votre équipe et montre les lots et les dossiers touchés par la modification.

Devons-nous changer de logiciel ?

Non. Bucky Research est construit à partir des données que vous publiez déjà, et Bucky Permitting se connecte aux logiciels que vous utilisez déjà.

Comment acheter Bucky ?

La plupart des municipalités commencent par un mandat de 12 mois qui respecte leurs règles d’approvisionnement. Réservez une démo et nous présenterons les étapes à votre équipe.

Quelles villes Bucky couvre-t-il ?

Bucky couvre plus de 700 villes au Canada et aux États-Unis. Le niveau de détail dépend de ce que chaque ville publie. Si la vôtre n’est pas encore en ligne, nous la cartographions pendant l’intégration.

Bucky est-il offert en français ?

Oui. Le logiciel, les rapports et le soutien sont offerts en français et en anglais.

Plateforme

  • Bucky Research
  • Bucky Permitting
  • Bucky Assets
  • Recherche par adresse
  • Bucky pour les municipalités
  • Bucky pour les promoteurs
  • Bucky MCP
  • Module Claude Code
  • Extension Chrome
  • Application Mac
  • Application iPhone
  • Documentation et API

Outils gratuits

  • Quel est le zonage de ma propriété ?
  • Quelles sont les dimensions de mon lot ?
  • Combien d’étages puis-je construire ?
  • Quelles sont mes marges de recul ?
  • Que puis-je construire dans ma cour intérieure ?
  • Frais de développement par ville
  • Calculateur de cascade de distribution
  • Calculateur de valeur résiduelle du terrain
  • Calculateur du coût de la recherche de site
  • Tous les outils gratuits

Guides de développement

  • Comment construire votre maison
  • Puis-je subdiviser mon lot ?
  • Construire un immeuble multilogement
  • Construire un logement accessoire
  • Logements de ruelle et de jardin
  • Financer votre première maison
  • Logiciel de préaménagement
  • Qu’est-ce que l’utilisation optimale d’un terrain ?
  • Frais de développement
  • Échéanciers de développement
  • Qu’est-ce que MLI Select ?

Notions de zonage

  • Qu’est-ce que le coefficient d’occupation du sol (COS) ?
  • Que sont les marges de recul ?
  • Qu’est-ce qu’une dérogation mineure ?
  • Qu’est-ce qu’une dérogation au zonage ?
  • Comité de dérogation
  • Glossaire

Entreprise

  • À propos
  • Carrières
  • Presse
  • Blogue
  • Infolettre
  • Réserver une démo
  • Demander votre ville
  • Contactez-nous
© 2026 Bucky AI Inc. · Montréal et Toronto
Se connecterConditions d’utilisationConfidentialitéSuppression des donnéesllms.txtAGENTS.mdsitemap.mdrobots.txthumans.txt
LinkedInInstagramXYouTubeTikTok