What are development charges?

Development charges are one-time fees a municipality collects on new homes and buildings to pay for the roads, pipes, transit and parks that growth needs. In Ontario each city sets its own schedule under the Development Charges Act. Toronto’s base rates effective June 26, 2025 range from about $52,676 for a one-bedroom apartment to $137,846 for a single or semi.

  • Set by a local by-law, not one national rate
  • Charged per unit, per m² or per hectare
  • Several authorities can charge one project
  • Rental and affordable homes often pay less
How a charge is calculated, on a real schedule

15 apartments in Toronto

Base schedule, June 26, 2025
Unit typeUnitsRateCharge
One bedroomNon-rental apartment10$52,676$526,760
Two bedroomsNon-rental apartment5$80,690$403,450
Municipal development charges, before relief$930,210
Per unit, on average$62,014$930,210 ÷ 15 units
A single or semi in Toronto$137,846Same schedule, per dwelling unit

Rates in CAD from the City of Toronto’s base schedule effective June 26, 2025, checked November 6, 2026. Assumes no exemptions, credits, reductions or interest. It shows the arithmetic, not a City quote.

Development charges can rival the land price. Look them up before you make an offer, not after you get a permit quote.

Bucky reads the zoning and lot facts for an address so you can count units early. It does not quote development charges. Get those from the municipality. Check an address.

By countryPublished ratesRental vs ownershipOther feesEstimate yours

Same idea, four names and four laws.

Growth pays for growth. Each province and state writes its own rules for how.

Who charges, under which law
WhereName and lawHow it works
OntarioDevelopment chargesDevelopment Charges Act, 1997Each municipality passes a by-law and schedule, usually per dwelling type, and per m² for non-residential. Regions and school boards can add their own.
British ColumbiaDevelopment cost chargesLocal Government Act; Vancouver Charter for DCLsCities and the regional district each charge. In Metro Vancouver, the region adds water, sewer and parkland DCCs on top of the city’s own. Vancouver calls its version development cost levies.
AlbertaOff-site leviesMunicipal Government Act, s. 648Calgary charges greenfield land per hectare at subdivision, and established-area projects per unit for water and wastewater treatment.
United StatesImpact feesState enabling acts, e.g. Texas Local Gov’t Code ch. 395Often per service unit for water and sewer, or by trips for roads. Fees must be roughly proportional to the impact, a test the US Supreme Court applied to legislated fees in Sheetz v. El Dorado County (2024).

General information, not legal advice. Each statute sets what the charge can fund, how it is calculated and when it is paid.

Published rates, a few cities side by side.

Each row covers different services, so do not add or rank them as all-in costs.

Rates as published, with the year
Place and chargeBasis
Single or detached
Apartment
Toronto, ONMunicipal DCs, basePer dwelling unitEffective June 26, 2025 · City of Toronto
$137,846
$52,676 1 bed$80,690 2+ bed
Metro Vancouver, BCRegional DCCs, Vancouver sewerage areaWater + liquid waste + parkland, per unitEffective July 24, 2026 · Metro Vancouver. City DCLs are extra.
$21,941
$13,392
Calgary, ABEstablished areaWater and wastewater treatment levies, per unitEffective Jan 1, 2026 · City of Calgary, Bylaw 1H2024
$9,328
$3,860 1 bed$4,825 2+ bed
Calgary, ABGreenfield areaOff-site levies, per hectareEffective Jan 1, 2026 · sum of the 11 levies, fees excluded
$664,597
per hectare
Austin, TXWater + wastewater impact feesPer service unit, USDLots platted after Oct 1, 2023 · Austin Water
US$7,700
by meter size

Amounts in CAD unless marked. Toronto schedule checked November 6, 2026; other cities October 31, 2026. Rates change, often every year, and reductions or exemptions may apply, so use the current schedule for a real budget.

Same 15 units, a different bill.

Toronto charges qualifying rental apartments less, and a 2026 by-law adds conditional reductions.

10 one-bedroom + 5 two-bedroom apartments, Toronto
Non-rental, baseJune 26, 2025 schedule
$930,210$62,014 per unit
Qualifying rental, base$33,497 and $48,299 per unit
$576,465$38,431 per unit
By-law 1261-2026 ratesConditional, non-rental
$477,440if the project qualifies

Computed from the rates on the City of Toronto schedule and By-law 1261-2026 ($31,606 and $32,276), as cited on Bucky’s development charges page. The rental category has a by-law definition, and renting out a unit does not qualify by itself. The 2026 rates depend on a provincial agreement and permit and occupancy dates.

What else is on the bill, beyond development charges.

A development charge schedule is not an all-in fee quote.

  • Education charges

    School boards in Ontario and school site charges in BC are often separate.

  • Parkland

    Land or cash in lieu, set by a separate by-law.

  • Community benefits or amenities

    Ontario’s community benefits charge and BC’s amenity cost charges, for larger projects.

  • Permit and application fees

    Building permits and rezoning or site plan fees, priced on their own.

  • Service connections

    New water, sewer and power lines, plus meters and inspections.

  • Timing and interest

    Some places let you defer or pay in instalments. In Ontario, an earlier planning application can lock in the rate.

Estimate it, in four steps.

Good enough for a land offer, then confirm with the municipality.

A first estimate
  1. 1Find every authority

    City, region or regional district, school board, and any area-specific charge.

  2. 2Get the current schedule

    Note the effective date and the date that locks in your rate.

  3. 3Count chargeable units

    By dwelling type and bedrooms, or by m² for non-residential.

  4. 4Apply relief and credits

    Exemptions, demolition credits, rental or affordable discounts.

Common questions

Are development charges the same across a province?

No. Each municipality sets its own schedule, and upper-tier or area-specific charges may also apply. Toronto’s rates cannot be used for Burlington or Ottawa.

Can I calculate them from the number of units alone?

No. You also need the dwelling types or floor area, the dates that set the rate, and the rules for exemptions, credits, discounts and interest. Ask the municipality to confirm the calculation.

Do I pay them on a second suite or garden suite?

Often not, or less. Ontario exempts some additional units in existing houses, and many cities discount small units. Check the exemption rules in your by-law.

Do development charges include every municipal fee?

No. Permit fees, education charges, community benefits charges and parkland can be separate. Build a full fee checklist for the city and the project.

When are Toronto’s June 26, 2025 rates locked in?

Ontario rules can lock the rate to an earlier planning application date, not only the building-permit date. Confirm the freeze date and any interest with the City before you budget.

Sources, statutes and city schedules.

Primary links for the rates and rules on this page.

  • Ontario: Development Charges Act, 1997
  • Ontario: municipal development and community benefits charges
  • City of Toronto: development chargesProgram notice checked November 6, 2026
  • City of Toronto: by-laws and ratesBase schedule effective June 26, 2025
  • Toronto: June 26, 2025 rate schedule (PDF)
  • Toronto: By-law 1261-2026 (conditional reductions)

Related

  • Toronto zoning by address
  • What is a minor variance?
  • Toronto Committee of Adjustment

Count the units, then the charges.

Bucky reads the zoning, lot and envelope for an address, so your estimate starts from real numbers.

Book a demoTry a free search
Bucky

L’intelligence immobilière pour l’industrie du bâtiment.

Demandez à l’IA à propos de Bucky

Logo ChatGPTChatGPTLogo GeminiGeminiLogo ClaudeClaudeLogo GrokGrokLogo PerplexityPerplexity

Restez à l’affût.

Un courriel par semaine : les nouvelles villes, ce qui a été lancé et le meilleur du blog.

Désabonnement en tout temps. Consultez notre politique de confidentialité.

Questions
fréquentes

Que fait Bucky ?

Bucky trouve chaque propriété qui convient à votre entreprise. Dites-nous ce que vous construisez, achetez ou planifiez, et nous dressons une liste des propriétés correspondantes dans votre secteur, actualisée chaque mois. Vous choisissez ce que devient la liste : un fichier, un rapport, une carte ou du courrier à la porte du propriétaire.

Qu’est-ce qu’une liste ?

Vos critères de recherche appliqués à un lieu. Par exemple : « les lots où un logement de jardin est possible » à Austin, ou « les lots prêts pour un multiplex, de moins de 2 acres » à Toronto. Bucky vérifie chaque parcelle et garde celles qui correspondent.

À qui s’adresse Bucky ?

À toute personne dont le travail commence par la bonne propriété. Les vendeurs de produits (logements accessoires, piscines, solaire, préfabriqué) l’utilisent pour joindre les propriétaires. Les promoteurs et les investisseurs l’utilisent pour trouver des sites avant leur mise en vente. Les villes et les bureaux de développement économique l’utilisent pour montrer ce qui peut être construit et attirer des projets.

D’où viennent les données, et puis-je m’y fier ?

Chaque fait est cité à sa source publique, jusqu’à l’article du règlement de zonage, ce qui vous permet de le défendre devant un client ou un urbaniste. Quand un fait n’est pas publié, Bucky l’indique comme introuvable plutôt que de deviner.

Quelles villes Bucky couvre-t-il ?

Bucky couvre plus de 700 villes au Canada et aux États-Unis. La profondeur dépend de ce que chaque ville publie. Si votre ville n’est pas encore active, demandez-la et nous la cartographierons.

Combien ça coûte ? Puis-je essayer d’abord ?

Oui. Le forfait gratuit recherche toutes les villes couvertes par Bucky et garde 3 listes avec filtres, plus autant de listes que vous en remplissez à la main. Les forfaits payants commencent à 29 $ USD par mois pour plus de listes avec filtres. Les rapports et les cartes postales sont facultatifs, et vous ne les payez que lorsque vous les commandez.

Dois-je installer quelque chose ?

Non. Bucky fonctionne dans votre navigateur. Il fonctionne aussi dans Claude et ChatGPT, dans Chrome à côté de l’annonce que vous lisez, ainsi que sur Mac et iPhone.

Plateforme

  • Comment ça marche
  • Cartes postales
  • Blog
  • Recherche par adresse
  • Recherche par ville
  • Fonctionnalités
  • Rapports
  • Exemple de rapport
  • Méthodologie des données
  • Tarifs
  • Réserver une démo
  • Logiciel de préaménagement

Produits et intégrations

  • Bucky Research
  • Bucky Permitting
  • Bucky MCP
  • Module Claude Code
  • Extension Chrome
  • Application Mac
  • Application iPhone
  • Documentation et API

Outils gratuits

  • Tous les outils gratuits
  • Quel est le zonage de ma propriété ?
  • Quelles sont les dimensions de mon lot ?
  • Combien d’étages puis-je construire ?
  • Quelles sont mes marges de recul ?
  • Que puis-je construire dans ma cour intérieure ?
  • Frais de développement par ville
  • Calculateur de cascade de distribution
  • Calculateur de valeur résiduelle du terrain
  • Calculateur du coût de la recherche de site

Conçu pour

  • Promoteurs
  • Architectes
  • Constructeurs
  • Concepteurs
  • Fournisseurs
  • Immobilier
  • Prêteurs
  • Produits de construction
  • Gouvernement
  • Institutions

Guides populaires

  • Comment construire votre maison
  • Puis-je subdiviser mon lot ?
  • Construire un immeuble multilogement
  • Construire un immeuble de moyenne hauteur
  • Construire un logement accessoire
  • Logements de ruelle et de jardin
  • Construire un garage
  • Construire un cabanon
  • Construire une serre
  • Installer un spa
  • Financer votre première maison

Notions de base

  • Qu’est-ce que le coefficient d’occupation du sol (COS) ?
  • Que sont les marges de recul ?
  • Qu’est-ce que le coefficient d’emprise au sol ?
  • Qu’est-ce qu’une dérogation mineure ?
  • Qu’est-ce qu’une dérogation au zonage ?
  • Qu’est-ce que l’utilisation optimale d’un terrain ?
  • Frais de développement
  • Échéanciers de développement
  • MLI Select (SCHL)
  • Comité de dérogation
  • Glossaire

Marchés populaires

  • Toronto
  • Vancouver
  • Montréal
  • Austin
  • Chicago
  • Brooklyn
  • Los Angeles
  • Denver
  • Minneapolis
  • Toutes les villes couvertes
  • Être avisé pour votre ville

Entreprise et assistance

  • À propos de nous
  • Carrières
  • Presse
  • Lire le blog
  • Nouveautés
  • Infolettre
  • Marchandise
  • Ambassadeurs
  • Étudiants
  • Aide et assistance
  • Contactez-nous
© 2026 Bucky AI Inc. · Montréal et Toronto
Se connecterConditions d’utilisationConfidentialitéSuppression des donnéesllms.txtAGENTS.mdsitemap.mdrobots.txthumans.txt
LinkedInInstagramXYouTubeTikTok