Passer au contenu
Bucky
  • Bucky ResearchTrouvez les propriétés où votre projet s’inscrit.
  • Bucky PermittingVérifiez chaque demande au regard de chaque règle, en quelques minutes.
|
|
Se connecterRéserver une démo
Bucky
|
  • Bucky ResearchTrouvez les propriétés où votre projet s’inscrit.
  • Bucky PermittingVérifiez chaque demande au regard de chaque règle, en quelques minutes.
Se connecterRéserver une démo
Sélectionné pour la première cohorte municipale d’IVÉOEn savoir plus →

What are setback requirements?

Setback requirements are the minimum distances a building must keep from a reference line, usually a property line. Zoning sets one for the front, the rear and each side, and a separate one for the street side of a corner lot. Together they draw a box inside the lot, and the building has to fit in it. The numbers change by zone, and in some cities they grow with the size of the lot.

  • Measured level, at a right angle to the line
  • Taken from a surveyed boundary, not a fence
  • Separate from lot coverage and FAR
  • Eaves, porches and stairs may reach in
Four setbacks on a real lot
3458 W 22nd AvVancouver · R1-1Imagery: Esri World Imagery

Lot and setbacks

R1-1 District Schedule · live in Bucky
Lot area
374.6 m²
Width × depth
10.1 × 37.3 m
Front
4.9 m§ 3.2.2
Rear
10.7 m§ 3.2.2
Each side
1.2 m§ 3.2.2
Flanking
Not extractedInterior lot, not a corner
Lot coverage
50%§ 3.2.2
Min. frontage 7.3 m
Pass
Width inside setbacks7.7 m10.06 − 1.2 − 1.2
Depth inside setbacks21.7 m37.34 − 4.9 − 10.7
Coverage cap187 m²374.6 × 50%
Buildable footprint166 m²The box is smaller, so it controls

Before projections and site exceptions. The setbacks leave 44% of this lot, less than the 50% coverage cap, so on this lot the setbacks are the tighter rule.

Setbacks start from the lot line. A fence, an aerial image or a parcel map is not a surveyed boundary. Use a survey when a design depends on a precise distance.

Bucky reads the front, rear, side and flanking setbacks for an address and cites the section. Check an address.

The four linesTexas lotFour citiesBuildable boxRules that scaleEncroachments

On a live Texas lot, four cited setbacks.

Cedar Park is live in Bucky. This Local Business lot already has height and setbacks on file from the nonresidential standards table.

2607 Poplar Lane · Cedar Park · LB
StandardValueSourceNote
Front setback25 ft§ 11.03.091Nonresidential development standards
Rear setback5 ft§ 11.03.091
Side setback12 ft§ 11.03.091Each side
Flanking setback25 ft§ 11.03.091Street side when it applies
Maximum height45 ft§ 11.03.091
Lot11,225 ft²Parcel R03468099.7 × 122.4 ft

Snapshot from Bucky, October 31, 2026. Site coverage and floor area ratio are not extracted for this zone yet — those gaps stay unknown, not unlimited. Frontage 99.7 ft and lot area 11,225 ft² both miss the zone minima; see the zoning variance guide.

Check setbacks on a Texas addressRead: What is a zoning variance?

The four lines, and how each is measured.

Every by-law names them a little differently, but the idea is the same.

Toronto defines rear and side setbacks from the lot line to the nearest main wall, measured horizontally at a right angle. Portland’s guidance also measures horizontally, not along sloping ground. So a steep lot does not get extra room, and the wall that sticks out furthest sets the distance.

  • Front

    From the front lot line on the street. Some cities let you match the average of your neighbours.

  • Rear

    From the back lot line. Often the largest, to keep a backyard.

  • Side

    From each side lot line. Sometimes a single figure, sometimes a combined total for both sides.

  • Flanking

    The street side of a corner lot. Cedar Park’s General Business zone sets 7.62 m (25 ft), § 11.03.091.

Four cities, four different boxes.

Real lots, read from the by-law or ordinance. Same idea, very different numbers.

Setbacks on real lots
LotFrontRearSideWhere it is set
3458 W 22nd AvVancouver · R1-1 · 374.6 m²4.9 m10.7 m1.2 m eachR1-1 District Schedule, 3.2.2
55 Hillsdale Ave EToronto · R · 429.45 m²6.0 m7.5 m0.9 m eachBy-law 569-2013, 10.10.40.70Front-yard averaging can change the front figure.
2313 W Iowa StChicago · RT-4 · 352.3 m²4.5 m14.8 ft11.3 m37.0 ft1.9 m total6.2 ft, both sidesZoning Ordinance 17-2-0305-B, 0306-C, 0309-AEach is a share of the lot. See below.
1222 W MillNew Braunfels TX · R-2 · 861.3 m²7.6 m25 ft6.1 m20 ft1.5 m each5 ftZoning ordinance, 3.3-2(b)

Live Bucky snapshots, October 2026. Lot areas from city parcel data. Corner-lot and flanking rules are not shown, because none of these four is a corner lot.

The buildable box, what is left in the middle.

Subtract the setbacks from the width and the depth, then multiply.

Share of each lot left inside the setbacks
New Braunfels · R-215.4 × 35.7 m
550 m²64% of lot
Toronto · R9.1 × 30.0 m
274 m²64% of lot
Chicago · RT-47.5 × 21.8 m
164 m²47% of lot
Vancouver · R1-17.7 × 21.7 m
166 m²44% of lot

Computed from the lot width and depth and the setbacks in the table above. Rectangular box only, before projections, exceptions and other rules.

  • Coverage can be tighter

    A 40% cap on a 450 m² lot is 180 m², even if the box is 216 m². The live page works this example.

  • FAR caps the floors

    The box sets the footprint. Floor area ratio sets the total across storeys.

  • Narrow lots lose most

    On Vancouver’s 10 m lot, the two side setbacks take 24% of the width.

  • Odd shapes need a drawing

    Corner, flag, through and irregular lots rarely leave a clean rectangle.

Rules that scale, Chicago’s percentages.

Toronto and Vancouver set fixed metres. Chicago’s RT-4 rules are shares of the lot, so a deeper lot gets a deeper yard.

2313 W Iowa St, the rule text applied
SetbackWhat the ordinance saysOn this lot
Front15 ft or 12% of lot depth, whichever is less. Or the average of the nearest 2 lots on either side.17-2-0305-B12% × 37.6 m = 4.5 m
Rear30% of lot depth or 50 ft, whichever is less, for principal buildings other than detached houses.17-2-0306-C30% × 37.6 m = 11.3 m
SidesCombined 20% of lot width, with neither side less than 2 ft or 8% of width. No side needs to exceed 5 ft.17-2-0309-A20% × 9.4 m = 1.9 meach side at least 0.75 m

Rule text as stored in Bucky. This lot is 9.4 m wide, below the 10.7 m (35 ft) minimum frontage Bucky reads for the zone, so it is a legal question before it is a setback question.

Encroachments, what may reach into a setback.

The setback is for the main wall. Eaves, porches, decks and stairs often get their own, smaller limits.

Toronto rules, applied to 55 Hillsdale Ave E
ProjectionToronto By-law 569-2013, 10.5.40.60On this lot
EavesUp to 0.9 m into a required setback, if no closer than 0.3 m to a lot line.10.5.40.60(7)(B)0.6 m into the 0.9 m side yardStops at 0.3 m from the line
Front porchFloor no higher than the first storey: the lesser of 2.5 m or 50% of the front setback.10.5.40.60(1)2.5 m into the 6.0 m front yardPorch can reach 3.5 m from the line
Rear deckFirst storey: the lesser of 2.5 m or 50% of the rear setback. Higher: 1.5 m or 50%.10.5.40.60(1)2.5 m into the 7.5 m rear yard1.5 m if raised above the first storey
Side platformFirst storey: up to 1.5 m, no closer than 0.3 m to the side lot line.10.5.40.60(1)0.6 mThe 0.3 m clearance governs
Exterior stairsNo wider than 2.0 m and no closer than 0.6 m to a lot line.10.5.40.60(3)0.3 m into the 0.9 m side yardMust stop 0.6 m from the line

Paraphrased from the toronto.ca consolidation of By-law 569-2013. Platforms must also keep their side clearances. Other cities use different numbers and some do not allow these projections at all.

See the setbacks on your lotRead: What is lot coverage?Read: What is floor area ratio?

Common questions

What are the setback requirements for my lot?

They depend on the city, the zone, any overlays, the shape of the lot, the building type and any site exceptions. Look up the current zoning for the address and confirm the boundary with a survey before you rely on a distance.

Does 40% lot coverage mean I can build anywhere on 40% of the lot?

No. The building must also stay inside the setbacks. How much you can cover and where you can put it are separate rules. See the lot coverage guide for the footprint limit.

Is a setback the same as a yard?

Close. Many codes call the open area between the lot line and the building a yard, and the minimum distance a setback. Read your code’s definitions, because they decide what can sit in the yard.

What if my design misses a setback?

Move or shrink the building, or ask for relief: a minor variance in Ontario, a variance or relaxation elsewhere in Canada, or a variance from the board in the US. Relief from one setback does not waive coverage, FAR or height.

Find the box on your lot.

Bucky reads the front, rear, side and flanking setbacks for an address, with the section cited.

Book a demoTry a free search
Bucky

L’intelligence immobilière pour l’industrie du bâtiment.

Demandez à l’IA à propos de Bucky

Logo ChatGPTChatGPTLogo GeminiGeminiLogo ClaudeClaudeLogo GrokGrokLogo PerplexityPerplexity

Restez à l’affût.

Un courriel par semaine : les nouvelles villes, ce qui a été lancé et le meilleur du blog.

Désabonnement en tout temps. Consultez notre politique de confidentialité.

Questions
fréquentes

Que fait Bucky ?

Bucky trouve chaque propriété qui convient à votre entreprise. Dites-nous ce que vous construisez, achetez ou planifiez, et nous dressons une liste des propriétés correspondantes dans votre secteur, actualisée chaque mois. Vous choisissez ce que devient la liste : un fichier, un rapport, une carte ou du courrier à la porte du propriétaire.

Qu’est-ce qu’une liste ?

Vos critères de recherche appliqués à un lieu. Par exemple : « les lots où un logement de jardin est possible » à Austin, ou « les lots prêts pour un multiplex, de moins de 2 acres » à Toronto. Bucky vérifie chaque parcelle et garde celles qui correspondent.

À qui s’adresse Bucky ?

À toute personne dont le travail commence par la bonne propriété. Les vendeurs de produits (logements accessoires, piscines, solaire, préfabriqué) l’utilisent pour joindre les propriétaires. Les promoteurs et les investisseurs l’utilisent pour trouver des sites avant leur mise en vente. Les villes et les bureaux de développement économique l’utilisent pour montrer ce qui peut être construit et attirer des projets.

D’où viennent les données, et puis-je m’y fier ?

Chaque fait est cité à sa source publique, jusqu’à l’article du règlement de zonage, ce qui vous permet de le défendre devant un client ou un urbaniste. Quand un fait n’est pas publié, Bucky l’indique comme introuvable plutôt que de deviner.

Quelles villes Bucky couvre-t-il ?

Bucky couvre plus de 700 villes au Canada et aux États-Unis. La profondeur dépend de ce que chaque ville publie. Si votre ville n’est pas encore active, demandez-la et nous la cartographierons.

Combien ça coûte ? Puis-je essayer d’abord ?

Oui. Le forfait gratuit recherche toutes les villes couvertes par Bucky et garde 3 listes avec filtres, plus autant de listes que vous en remplissez à la main. Les forfaits payants commencent à 29 $ USD par mois pour plus de listes avec filtres. Les rapports et les cartes postales sont facultatifs, et vous ne les payez que lorsque vous les commandez.

Dois-je installer quelque chose ?

Non. Bucky fonctionne dans votre navigateur. Il fonctionne aussi dans Claude et ChatGPT, dans Chrome à côté de l’annonce que vous lisez, ainsi que sur Mac et iPhone.

Plateforme

  • Comment ça marche
  • Cartes postales
  • Blog
  • Recherche par adresse
  • Recherche par ville
  • Fonctionnalités
  • Rapports
  • Exemple de rapport
  • Méthodologie des données
  • Tarifs
  • Réserver une démo
  • Logiciel de préaménagement

Produits et intégrations

  • Bucky Research
  • Bucky Permitting
  • Bucky MCP
  • Module Claude Code
  • Extension Chrome
  • Application Mac
  • Application iPhone
  • Documentation et API

Outils gratuits

  • Tous les outils gratuits
  • Quel est le zonage de ma propriété ?
  • Quelles sont les dimensions de mon lot ?
  • Combien d’étages puis-je construire ?
  • Quelles sont mes marges de recul ?
  • Que puis-je construire dans ma cour intérieure ?
  • Frais de développement par ville
  • Calculateur de cascade de distribution
  • Calculateur de valeur résiduelle du terrain
  • Calculateur du coût de la recherche de site

Conçu pour

  • Promoteurs
  • Architectes
  • Constructeurs
  • Concepteurs
  • Fournisseurs
  • Immobilier
  • Prêteurs
  • Produits de construction
  • Gouvernement
  • Institutions

Guides populaires

  • Comment construire votre maison
  • Puis-je subdiviser mon lot ?
  • Construire un immeuble multilogement
  • Construire un immeuble de moyenne hauteur
  • Construire un logement accessoire
  • Logements de ruelle et de jardin
  • Construire un garage
  • Construire un cabanon
  • Construire une serre
  • Installer un spa
  • Financer votre première maison

Notions de base

  • Qu’est-ce que le coefficient d’occupation du sol (COS) ?
  • Que sont les marges de recul ?
  • Qu’est-ce que le coefficient d’emprise au sol ?
  • Qu’est-ce qu’une dérogation mineure ?
  • Qu’est-ce qu’une dérogation au zonage ?
  • Qu’est-ce que l’utilisation optimale d’un terrain ?
  • Frais de développement
  • Échéanciers de développement
  • MLI Select (SCHL)
  • Comité de dérogation
  • Glossaire

Marchés populaires

  • Toronto
  • Vancouver
  • Montréal
  • Austin
  • Chicago
  • Brooklyn
  • Los Angeles
  • Denver
  • Minneapolis
  • Toutes les villes couvertes
  • Être avisé pour votre ville

Entreprise et assistance

  • À propos de nous
  • Carrières
  • Presse
  • Lire le blog
  • Nouveautés
  • Infolettre
  • Marchandise
  • Ambassadeurs
  • Étudiants
  • Aide et assistance
  • Contactez-nous
© 2026 Bucky AI Inc. · Montréal et Toronto
Se connecterConditions d’utilisationConfidentialitéSuppression des donnéesllms.txtAGENTS.mdsitemap.mdrobots.txthumans.txt
LinkedInInstagramXYouTubeTikTok